2017 FISH SPAWN
PROJECT PRINCIPLE FISH SPAWNING PERIOD FOR OPERATIONAL CONSIDERATIONS 1 OPERATION START DATE TARGET STARTING ELEVATION DESIRED MINIMUM OPERATIONAL ELEVATION END OF 4 WKS ** ENDING DATE CURRENT STATUS
LANIER (BUFORD) 01 April - 01 June 01-APR-17 1061.4 1060.9 29-APR-17 TBD ongoing
WEST POINT 01 April - 01 June TBD TBD        
GEORGE 15 March - 15 May 28-MAR-17 188.86 188.36 25-APR-17 TBD ongoing
SEMINOLE (WOODRUFF) 01 March - 01 May 01-MAR-17 76.99 76.49 29-MAR-17 29-MAR-17  complete
APALACHICOLA RIVER  01 April - 01 June     RIOP     Continuous*
ALLATOONA 15 March - 15 May 15-MAR-17 830.71 830.21 11-APR-17 TBD ongoing
OKATIBBEE 01 April - 01 June TBD TBD        
     
1. The goal is to manage the reservoir or river conditions for 4-6 weeks within this 8 week period, if conditions allow. 
2. Steady lake levels may be impossible to achieve during floods and droughts.
* Following the Revised Interim Operating Plan (RIOP) and the Biological Opinion issued by the FWS
Return to Water Management Main Page