2017 FISH SPAWN
PROJECT PRINCIPLE FISH SPAWNING PERIOD FOR OPERATIONAL CONSIDERATIONS 1 OPERATION START DATE TARGET STARTING ELEVATION DESIRED MINIMUM OPERATIONAL ELEVATION END OF 4 WKS ** ENDING DATE CURRENT STATUS
LANIER (BUFORD) 01 April - 01 June 01-APR-17 1061.4 1060.9 29-APR-17 29-APR-17  complete
WEST POINT 01 April - 01 June 03-MAY-17 632.35 631.85 31-MAY-17 TBD ongoing
GEORGE 15 March - 15 May 23-APR-17 187.75 187.25 21-MAY-17 TBD ongoing
SEMINOLE (WOODRUFF) 01 March - 01 May 01-MAR-17 76.99 76.49 29-MAR-17 29-MAR-17  complete
APALACHICOLA RIVER  01 April - 01 June     RIOP     Continuous*
ALLATOONA 15 March - 15 May 15-MAR-17 830.71 830.21 11-APR-17 25-APR-17 complete
OKATIBBEE 01 April - 01 June 01-MAY-17 343.46 342.96 29-MAY-17 TBD ongoing
     
1. The goal is to manage the reservoir or river conditions for 4-6 weeks within this 8 week period, if conditions allow. 
2. Steady lake levels may be impossible to achieve during floods and droughts.
* Following the Revised Interim Operating Plan (RIOP) and the Biological Opinion issued by the FWS
Return to Water Management Main Page