2018 FISH SPAWN
PROJECT PRINCIPLE FISH SPAWNING PERIOD FOR OPERATIONAL CONSIDERATIONS 1 OPERATION START DATE TARGET STARTING ELEVATION DESIRED MINIMUM OPERATIONAL ELEVATION END OF 4 WKS ENDING DATE CURRENT STATUS
LANIER (BUFORD) 01 April - 01 June 01APR2018 1070.68 1070.18 29APR2018 9MAY2018 Complete
WEST POINT 01 April - 01 June 01APR2018 632.12 631.62 29APR2018 23APR2018 Complete
GEORGE 15 March - 15 May 15MAR2018 189.02 188.52 8APR2018 8APR2018 Complete
SEMINOLE (WOODRUFF) 01 March - 01 May 03MAR2018 77.06 76.56 31MAR2018 28MAR2018 Complete
APALACHICOLA RIVER  01 April - 01 June     WCP     Continuous*
ALLATOONA 15 March - 15 May 23MAR2018 834.65 834.15 20APR2018 20APR2018 Complete
OKATIBBEE 01 April - 01 June 24APR2018 343.16 342.66 22MAY2018 TBD Ongoing
     
1. The goal is to manage the reservoir or river conditions for 4-6 weeks within this 8 week period, if conditions allow. 
       Steady lake levels may be impossible to achieve during floods and droughts.
* Following the  Water Control Manual Plan (WCP) and the Biological Opinion issued by the FWS
Return to Water Management Main Page