March 2, 2010: Modified Buford guide curve on lake level forecast
page to correctly reflect ’91 Buford manual.
January 15, 2009: Adjustments were made to the historical inflow
at Millers Ferry and Robert F. Henry for the period JANUARY 1, 2002 to JULY 1, 2008.
An incorrect storage calculation occurred during this period. These revisions did not result in a
change to the operations of the project.
June 26, 2007: Adjustments
were made to the headwater and tailwater gages at Carters Dam to recalibrate
the electronic measurements to actual water surface elevations. The
calibrations were applied to the data beginning on June 26, 2007. This revision
did not result in a change to the operations of the project.
April 18, 2007: Adjustments
were made to the headwater and tailwater gages at
December 12, 2006:
Adjustments were made to the headwater and tailwater gages at Jim Woodruff Dam
to recalibrate the electronic measurements to actual water surface elevations.
The calibrations were applied to the data beginning on December 12, 2006. This
revision did not result in a change to the operations of the project.
December 6, 2006:
Adjustments were made to the headwater and tailwater gages at Walter F. George
Dam to recalibrate the electronic measurements to actual water surface elevations.
This revision did not result in a change to the operations of the project.
September 11, 2006: Minor
revisions were made to the IOP basin inflow computations due to an incorrect
storage calculation and due to missing data received from the