Water Management Data Revisions

March 2, 2010: Modified Buford guide curve on lake level forecast page to correctly reflect ’91 Buford manual.

 

January 15, 2009: Adjustments were made to the historical inflow at Millers Ferry and Robert F. Henry for the period JANUARY 1, 2002 to JULY 1, 2008. An incorrect storage calculation occurred during this period.  These revisions did not result in a change to the operations of the project.

June 26, 2007: Adjustments were made to the headwater and tailwater gages at Carters Dam to recalibrate the electronic measurements to actual water surface elevations. The calibrations were applied to the data beginning on June 26, 2007. This revision did not result in a change to the operations of the project.

April 18, 2007: Adjustments were made to the headwater and tailwater gages at West Point Dam to recalibrate the electronic measurements to actual water surface elevations. The calibrations were applied to the data beginning on April 18, 2007. This revision did not result in a change to the operations of the project.

December 12, 2006: Adjustments were made to the headwater and tailwater gages at Jim Woodruff Dam to recalibrate the electronic measurements to actual water surface elevations. The calibrations were applied to the data beginning on December 12, 2006. This revision did not result in a change to the operations of the project.

December 6, 2006: Adjustments were made to the headwater and tailwater gages at Walter F. George Dam to recalibrate the electronic measurements to actual water surface elevations. This revision did not result in a change to the operations of the project.

September 11, 2006: Minor revisions were made to the IOP basin inflow computations due to an incorrect storage calculation and due to missing data received from the Chattahoochee gage. The revisions were applied to the July 25 - September 11, 2006 data. This revision would not have resulted in a change to the releases made during that period.

 